Ukraine energy storage project

Customer: Ukrenergo

Country: Ukraine

Period: 2019

RTE international has carried out comprehensive feasibility studies for the installation of a battery storage system in Ukraine.
This system is intended to manage frequency control reserves and to be used as an alternative to invest in peak production capacity.

Services provided

  • Technical studies to determine the most relevant location for the storage system and to define the power and energy values
  • Economic studies on the different applications of the storage unit
  • Network study on fast-charging stations
  • Technical assistance in the tendering process
  • Environmental and social impact studies