Customer: Ukrenergo
Country: Ukraine
Period: 2019
RTE international has carried out comprehensive feasibility studies for the installation of a battery storage system in Ukraine.
This system is intended to manage frequency control reserves and to be used as an alternative to invest in peak production capacity.
Tour La Fayette
2 Place des Vosges
92400 Courbevoie FRANCE