Technical and financial feasibility study for the construction of the HV transmission network between the Niger River and Niger Centre East (NCE) zones, preliminary design and detailed design studies and preparation of the tender documents.
Services delivered
Project management
Data collection and analysis
Demand forecast for the substations to connect
Technical-economic comparison to select the optimal voltage level (330 or 132 kV, the 66 kV level no longer suitable to supply the demand) and the connection scheme for the interconnection line and the substations to connect
Selection of the lines’ routes
Preliminary design study of the project’s HV transmission lines and substations
Detailed design studies and bidding documents for project’s HV transmission lines and substation