Risk assessment in a multi-vendor, multi-technology HVDC – offshore wind farm by C&P replica systems

Customer: North Sea Wind Power Hub, consortium composé d’Energinet, Gasunie Tennet Allemagne et Tennet Pays-Bas.

Country: North Sea

Period: 2021

RTE international will evaluate how to de-risk this transnational and modular project by using hardware-in-the-loop (HIL) testing. The scope includes the evaluation of operational risks in a multi-vendor, multi-technology HVDC-OWF system, recommendations of a de-risking methodology for the NSWPH concept and case studies with references to lessons learnt by RTE international.

Deliberables

  • Final report
  • Presentation