Customer: Equinor
Country: Norway
Period: 2018 - 2022
The Johan Sverdrup oil field is powered by two HVDC-VSC links, provided by different manufacturers, and which will be used in parallel operation. This situation necessitated comprehensive interaction studies to minimise risk to the security of supply.
Since early 2018, RTE international has been supporting Equinor in carrying out PSCAD Electro Magnetic Transient (EMT) studies in order to assess the interoperability issues associated with the parallel operation of these two HVDC links. With regards to potential risks related to the parallel operation, Equinor hired RTE international to setup and host the control replicas of the two HVDC systems, as well as a real-time simulator in the RTE international real-time laboratory facilities in Jonage (Lyon), France.