RTE international supported TEIAŞ to study the stability of its network with the arrival of the Akkuyu nuclear power plant comprised of four 1200 MW units.
Services delivered
Presentation of the methodology of stability studies that RTE carries out in the context of nuclear generation.
Presentation of RTE’s practices in terms of the design of the Insulation Fault Protection Scheme.
Analysis of the current methodology that TEIAŞ uses in terms of stability and protection.
Recommendations for managing the protection design regarding stability and insulation fault protection.