Study of the defence plan for the Ivorian electricity network
Study of the defence plan for the Ivorian electricity network
Client | Compagnie Ivoirienne d’Electricité |
Country | Côte d’Ivoire |
Period | 2019 |
RTE international produced a Defence Plan for the electricity network in the Ivory Coast, taking into account the operating constraints on the network over the 2020-2022 period and the assessment of its stability.
Services provided
- Static study on the constraints of the Ivorian network
- Analysis of the voltage profil
- Analysis of the loading of network equipment (lines, transformers…)
- Transient stability study to analyse voltage and frequency changes
- Analysis in case of loss of some of the largest generating units and interconnections
- Analysis of the risks of frequency collapse and loss of synchronism
- Proposal of a defence plan to improve network security
- Proposal of a methodology for load shedding with different criteria (voltage, transit, frequency)
- Proposal of thresholds for load shedding